Adding benchmarks for new tests
This commit is contained in:
@@ -0,0 +1,35 @@
|
||||
Page 1 Fri Mar 23 14:48:34 2018
|
||||
|
||||
******************************************************************
|
||||
* E P A N E T *
|
||||
* Hydraulic and Water Quality *
|
||||
* Analysis for Pipe Networks *
|
||||
* Version 2.00.12 *
|
||||
******************************************************************
|
||||
|
||||
Analysis begun Fri Mar 23 14:48:34 2018
|
||||
|
||||
|
||||
Hydraulic Status:
|
||||
-----------------------------------------------------------------------
|
||||
0:00:00: Balancing the network:
|
||||
Trial 1: relative flow change = 0.599514
|
||||
Trial 2: relative flow change = 0.586701
|
||||
Trial 3: relative flow change = 0.052868
|
||||
PRV 12 switched from active to open
|
||||
PRV 13 switched from active to open
|
||||
Trial 4: relative flow change = 0.041194
|
||||
Trial 5: relative flow change = 0.020306
|
||||
Trial 6: relative flow change = 0.011794
|
||||
Trial 7: relative flow change = 0.007513
|
||||
Trial 8: relative flow change = 0.004786
|
||||
Trial 9: relative flow change = 0.003051
|
||||
Trial 10: relative flow change = 0.001946
|
||||
Trial 11: relative flow change = 0.001241
|
||||
Trial 12: relative flow change = 0.000792
|
||||
0:00:00: Balanced after 12 trials
|
||||
0:00:00: Reservoir 1 is emptying
|
||||
0:00:00: PRV 12 open
|
||||
0:00:00: PRV 13 open
|
||||
|
||||
Analysis ended Fri Mar 23 14:48:34 2018
|
||||
Reference in New Issue
Block a user