Adding benchmarks for new tests
This commit is contained in:
Binary file not shown.
@@ -0,0 +1,34 @@
|
||||
Page 1 Fri Mar 23 14:48:38 2018
|
||||
|
||||
******************************************************************
|
||||
* E P A N E T *
|
||||
* Hydraulic and Water Quality *
|
||||
* Analysis for Pipe Networks *
|
||||
* Version 2.00.12 *
|
||||
******************************************************************
|
||||
|
||||
Analysis begun Fri Mar 23 14:48:38 2018
|
||||
|
||||
|
||||
Hydraulic Status:
|
||||
-----------------------------------------------------------------------
|
||||
0:00:00: Balancing the network:
|
||||
Trial 1: relative flow change = 0.995170
|
||||
Trial 2: relative flow change = 0.255385
|
||||
Pipe 142 switched from open to closed
|
||||
Pipe 143 switched from open to closed
|
||||
Trial 3: relative flow change = 0.976055
|
||||
Trial 4: relative flow change = 0.084588
|
||||
Trial 5: relative flow change = 0.014087
|
||||
Trial 6: relative flow change = 0.001687
|
||||
Trial 7: relative flow change = 0.000033
|
||||
0:00:00: Balanced after 7 trials
|
||||
0:00:00: Reservoir 40 is emptying
|
||||
0:00:00: Tank 41 is closed at 10.00 ft
|
||||
0:00:00: Tank 42 is closed at 10.00 ft
|
||||
0:00:00: Pipe 142 temporarily closed
|
||||
0:00:00: Pipe 143 temporarily closed
|
||||
|
||||
WARNING: Negative pressures at 0:00:00 hrs.
|
||||
|
||||
Analysis ended Fri Mar 23 14:48:38 2018
|
||||
Reference in New Issue
Block a user