Adding benchmarks for new tests
This commit is contained in:
BIN
tests/epanet-nrtestsuite/benchmark/epanet-2012/fcv2/fcv2.out
Normal file
BIN
tests/epanet-nrtestsuite/benchmark/epanet-2012/fcv2/fcv2.out
Normal file
Binary file not shown.
26
tests/epanet-nrtestsuite/benchmark/epanet-2012/fcv2/fcv2.rpt
Normal file
26
tests/epanet-nrtestsuite/benchmark/epanet-2012/fcv2/fcv2.rpt
Normal file
@@ -0,0 +1,26 @@
|
||||
Page 1 Fri Mar 23 14:48:38 2018
|
||||
|
||||
******************************************************************
|
||||
* E P A N E T *
|
||||
* Hydraulic and Water Quality *
|
||||
* Analysis for Pipe Networks *
|
||||
* Version 2.00.12 *
|
||||
******************************************************************
|
||||
|
||||
Analysis begun Fri Mar 23 14:48:38 2018
|
||||
|
||||
|
||||
Hydraulic Status:
|
||||
-----------------------------------------------------------------------
|
||||
0:00:00: Balancing the network:
|
||||
Trial 1: relative flow change = 0.983623
|
||||
Trial 2: relative flow change = 0.992520
|
||||
Trial 3: relative flow change = 0.639463
|
||||
Trial 4: relative flow change = 0.198357
|
||||
Trial 5: relative flow change = 0.016748
|
||||
Trial 6: relative flow change = 0.000119
|
||||
0:00:00: Balanced after 6 trials
|
||||
0:00:00: Reservoir R1 is emptying
|
||||
0:00:00: Reservoir R2 is filling
|
||||
|
||||
Analysis ended Fri Mar 23 14:48:38 2018
|
||||
Reference in New Issue
Block a user