Page 1 Fri Mar 23 14:48:38 2018 ****************************************************************** * E P A N E T * * Hydraulic and Water Quality * * Analysis for Pipe Networks * * Version 2.00.12 * ****************************************************************** Analysis begun Fri Mar 23 14:48:38 2018 Hydraulic Status: ----------------------------------------------------------------------- 0:00:00: Balancing the network: Trial 1: relative flow change = 0.995170 Trial 2: relative flow change = 0.255385 Pipe 142 switched from open to closed Pipe 143 switched from open to closed Trial 3: relative flow change = 0.976055 Trial 4: relative flow change = 0.084588 Trial 5: relative flow change = 0.014087 Trial 6: relative flow change = 0.001687 Trial 7: relative flow change = 0.000033 0:00:00: Balanced after 7 trials 0:00:00: Reservoir 40 is emptying 0:00:00: Tank 41 is closed at 10.00 ft 0:00:00: Tank 42 is closed at 10.00 ft 0:00:00: Pipe 142 temporarily closed 0:00:00: Pipe 143 temporarily closed WARNING: Negative pressures at 0:00:00 hrs. Analysis ended Fri Mar 23 14:48:38 2018