Page 1 Tue Jan 22 11:23:06 2013 ****************************************************************** * E P A N E T * * Hydraulic and Water Quality * * Analysis for Pipe Networks * * Version 2.00.12 * ****************************************************************** Analysis begun Tue Jan 22 11:23:06 2013 Hydraulic Status: ----------------------------------------------------------------------- 0:00:00: Balanced after 5 trials 0:00:00: Reservoir River is emptying 0:00:00: Reservoir Lake is closed 0:00:00: Tank 1 is filling at 13.10 ft 0:00:00: Tank 2 is emptying at 23.50 ft 0:00:00: Tank 3 is filling at 29.00 ft 1:00:00: Pump 10 changed by timer control 1:00:00: Balanced after 7 trials 1:00:00: Reservoir Lake is emptying 1:00:00: Pump 10 changed from closed to open 2:00:00: Balanced after 3 trials 2:00:00: Tank 2 is filling at 20.90 ft 3:00:00: Balanced after 2 trials 4:00:00: Balanced after 3 trials 4:13:33: Pump 335 changed by Tank 1 control 4:13:33: Pipe 330 changed by Tank 1 control 4:13:33: Balanced after 4 trials 4:13:33: Pipe 330 changed from closed to open 4:13:33: Pump 335 changed from open to closed 5:00:00: Balanced after 3 trials 5:00:00: Tank 3 is emptying at 34.30 ft 6:00:00: Balanced after 3 trials 6:00:00: Tank 3 is filling at 34.12 ft 7:00:00: Balanced after 3 trials 8:00:00: Balanced after 2 trials 9:00:00: Balanced after 3 trials 9:00:00: Tank 3 is emptying at 35.15 ft 10:00:00: Balanced after 2 trials 10:00:00: Tank 1 is emptying at 22.20 ft 11:00:00: Balanced after 3 trials 11:00:00: Tank 2 is emptying at 27.70 ft 12:00:00: Balanced after 2 trials 12:00:00: Tank 2 is filling at 27.64 ft 13:00:00: Balanced after 3 trials 13:00:00: Tank 1 is filling at 21.73 ft 14:00:00: Balanced after 3 trials 15:00:00: Pump 10 changed by timer control 15:00:00: Balanced after 5 trials 15:00:00: Reservoir Lake is closed 15:00:00: Tank 1 is emptying at 21.98 ft 15:00:00: Tank 2 is emptying at 28.20 ft 15:00:00: Pump 10 changed from open to closed 16:00:00: Balanced after 3 trials 17:00:00: Balanced after 2 trials 18:00:00: Balanced after 3 trials 19:00:00: Balanced after 2 trials 20:00:00: Balanced after 3 trials 21:00:00: Balanced after 2 trials 21:19:39: Pump 335 changed by Tank 1 control 21:19:39: Pipe 330 changed by Tank 1 control 21:19:39: Balanced after 5 trials 21:19:39: Tank 1 is filling at 17.10 ft 21:19:39: Tank 3 is filling at 29.68 ft 21:19:39: Pipe 330 changed from open to closed 21:19:39: Pump 335 changed from closed to open 22:00:00: Balanced after 3 trials 22:00:00: Tank 1 is emptying at 17.30 ft 23:00:00: Balanced after 3 trials 24:00:00: Balanced after 4 trials 24:00:00: Tank 1 is filling at 15.79 ft Analysis ended Tue Jan 22 11:23:18 2013