Files
EPANET/tests/epanet-nrtestsuite/benchmark/epanet-2012/NET1/NET1.rpt
2018-03-22 17:27:53 -04:00

25 lines
1.0 KiB
Plaintext

Page 1 Thu Mar 22 17:13:07 2018
******************************************************************
* E P A N E T *
* Hydraulic and Water Quality *
* Analysis for Pipe Networks *
* Version 2.00.12 *
******************************************************************
Analysis begun Thu Mar 22 17:13:07 2018
Hydraulic Status:
-----------------------------------------------------------------------
0:00:00: Balancing the network:
Trial 1: relative flow change = 0.763338
Trial 2: relative flow change = 0.090158
Trial 3: relative flow change = 0.003566
Trial 4: relative flow change = 0.000023
0:00:00: Balanced after 4 trials
0:00:00: Reservoir 9 is emptying
0:00:00: Tank 2 is filling at 120.00 ft
Analysis ended Thu Mar 22 17:13:07 2018