36 lines
1.6 KiB
Plaintext
36 lines
1.6 KiB
Plaintext
Page 1 Fri Mar 23 14:48:34 2018
|
|
|
|
******************************************************************
|
|
* E P A N E T *
|
|
* Hydraulic and Water Quality *
|
|
* Analysis for Pipe Networks *
|
|
* Version 2.00.12 *
|
|
******************************************************************
|
|
|
|
Analysis begun Fri Mar 23 14:48:34 2018
|
|
|
|
|
|
Hydraulic Status:
|
|
-----------------------------------------------------------------------
|
|
0:00:00: Balancing the network:
|
|
Trial 1: relative flow change = 0.599514
|
|
Trial 2: relative flow change = 0.586701
|
|
Trial 3: relative flow change = 0.052868
|
|
PRV 12 switched from active to open
|
|
PRV 13 switched from active to open
|
|
Trial 4: relative flow change = 0.041194
|
|
Trial 5: relative flow change = 0.020306
|
|
Trial 6: relative flow change = 0.011794
|
|
Trial 7: relative flow change = 0.007513
|
|
Trial 8: relative flow change = 0.004786
|
|
Trial 9: relative flow change = 0.003051
|
|
Trial 10: relative flow change = 0.001946
|
|
Trial 11: relative flow change = 0.001241
|
|
Trial 12: relative flow change = 0.000792
|
|
0:00:00: Balanced after 12 trials
|
|
0:00:00: Reservoir 1 is emptying
|
|
0:00:00: PRV 12 open
|
|
0:00:00: PRV 13 open
|
|
|
|
Analysis ended Fri Mar 23 14:48:34 2018
|