35 lines
1.5 KiB
Plaintext
35 lines
1.5 KiB
Plaintext
Page 1 Fri Mar 23 14:48:39 2018
|
|
|
|
******************************************************************
|
|
* E P A N E T *
|
|
* Hydraulic and Water Quality *
|
|
* Analysis for Pipe Networks *
|
|
* Version 2.00.12 *
|
|
******************************************************************
|
|
|
|
Analysis begun Fri Mar 23 14:48:39 2018
|
|
|
|
|
|
Hydraulic Status:
|
|
-----------------------------------------------------------------------
|
|
0:00:00: Balancing the network:
|
|
Trial 1: relative flow change = 0.985507
|
|
Trial 2: relative flow change = 0.391213
|
|
Pipe 142 switched from open to closed
|
|
Pipe 143 switched from open to closed
|
|
Trial 3: relative flow change = 0.505790
|
|
Trial 4: relative flow change = 0.035713
|
|
Trial 5: relative flow change = 0.006044
|
|
Trial 6: relative flow change = 0.001067
|
|
Trial 7: relative flow change = 0.000099
|
|
0:00:00: Balanced after 7 trials
|
|
0:00:00: Reservoir 40 is emptying
|
|
0:00:00: Tank 41 is closed at 10.00 ft
|
|
0:00:00: Tank 42 is closed at 10.00 ft
|
|
0:00:00: Pipe 142 temporarily closed
|
|
0:00:00: Pipe 143 temporarily closed
|
|
|
|
WARNING: Negative pressures at 0:00:00 hrs.
|
|
|
|
Analysis ended Fri Mar 23 14:48:39 2018
|