Files
EPANET/tests/epanet-nrtestsuite/benchmark/epanet-2012/test101/test101.rpt
2018-04-02 11:33:11 -04:00

29 lines
1.2 KiB
Plaintext

Page 1 Fri Mar 23 14:48:40 2018
******************************************************************
* E P A N E T *
* Hydraulic and Water Quality *
* Analysis for Pipe Networks *
* Version 2.00.12 *
******************************************************************
Analysis begun Fri Mar 23 14:48:40 2018
Hydraulic Status:
-----------------------------------------------------------------------
0:00:00: Balancing the network:
Trial 1: relative flow change = 0.823588
Trial 2: relative flow change = 0.725899
Trial 3: relative flow change = 0.412026
Trial 4: relative flow change = 0.128355
Trial 5: relative flow change = 0.020158
Trial 6: relative flow change = 0.002123
0:00:00: Balanced after 6 trials
0:00:00: Reservoir 1 is emptying
0:00:00: Reservoir 32 is filling
WARNING: Negative pressures at 0:00:00 hrs.
Analysis ended Fri Mar 23 14:48:40 2018