Updating benchmark with new tests
This commit is contained in:
BIN
tests/epanet-nrtestsuite/benchmark/epanet-2012/NET1/NET1.out
Normal file
BIN
tests/epanet-nrtestsuite/benchmark/epanet-2012/NET1/NET1.out
Normal file
Binary file not shown.
24
tests/epanet-nrtestsuite/benchmark/epanet-2012/NET1/NET1.rpt
Normal file
24
tests/epanet-nrtestsuite/benchmark/epanet-2012/NET1/NET1.rpt
Normal file
@@ -0,0 +1,24 @@
|
||||
Page 1 Thu Mar 22 17:13:07 2018
|
||||
|
||||
******************************************************************
|
||||
* E P A N E T *
|
||||
* Hydraulic and Water Quality *
|
||||
* Analysis for Pipe Networks *
|
||||
* Version 2.00.12 *
|
||||
******************************************************************
|
||||
|
||||
Analysis begun Thu Mar 22 17:13:07 2018
|
||||
|
||||
|
||||
Hydraulic Status:
|
||||
-----------------------------------------------------------------------
|
||||
0:00:00: Balancing the network:
|
||||
Trial 1: relative flow change = 0.763338
|
||||
Trial 2: relative flow change = 0.090158
|
||||
Trial 3: relative flow change = 0.003566
|
||||
Trial 4: relative flow change = 0.000023
|
||||
0:00:00: Balanced after 4 trials
|
||||
0:00:00: Reservoir 9 is emptying
|
||||
0:00:00: Tank 2 is filling at 120.00 ft
|
||||
|
||||
Analysis ended Thu Mar 22 17:13:07 2018
|
||||
Reference in New Issue
Block a user