Page 1 Tue Jan 22 11:23:06 2013
|
|
|
|
******************************************************************
|
|
* E P A N E T *
|
|
* Hydraulic and Water Quality *
|
|
* Analysis for Pipe Networks *
|
|
* Version 2.00.12 *
|
|
******************************************************************
|
|
|
|
Analysis begun Tue Jan 22 11:23:06 2013
|
|
|
|
|
|
Hydraulic Status:
|
|
-----------------------------------------------------------------------
|
|
0:00:00: Balanced after 5 trials
|
|
0:00:00: Reservoir River is emptying
|
|
0:00:00: Reservoir Lake is closed
|
|
0:00:00: Tank 1 is filling at 13.10 ft
|
|
0:00:00: Tank 2 is emptying at 23.50 ft
|
|
0:00:00: Tank 3 is filling at 29.00 ft
|
|
|
|
1:00:00: Pump 10 changed by timer control
|
|
1:00:00: Balanced after 7 trials
|
|
1:00:00: Reservoir Lake is emptying
|
|
1:00:00: Pump 10 changed from closed to open
|
|
|
|
2:00:00: Balanced after 3 trials
|
|
2:00:00: Tank 2 is filling at 20.90 ft
|
|
|
|
3:00:00: Balanced after 2 trials
|
|
|
|
4:00:00: Balanced after 3 trials
|
|
|
|
4:13:33: Pump 335 changed by Tank 1 control
|
|
4:13:33: Pipe 330 changed by Tank 1 control
|
|
4:13:33: Balanced after 4 trials
|
|
4:13:33: Pipe 330 changed from closed to open
|
|
4:13:33: Pump 335 changed from open to closed
|
|
|
|
5:00:00: Balanced after 3 trials
|
|
5:00:00: Tank 3 is emptying at 34.30 ft
|
|
|
|
6:00:00: Balanced after 3 trials
|
|
6:00:00: Tank 3 is filling at 34.12 ft
|
|
|
|
7:00:00: Balanced after 3 trials
|
|
|
|
8:00:00: Balanced after 2 trials
|
|
|
|
9:00:00: Balanced after 3 trials
|
|
9:00:00: Tank 3 is emptying at 35.15 ft
|
|
|
|
10:00:00: Balanced after 2 trials
|
|
10:00:00: Tank 1 is emptying at 22.20 ft
|
|
|
|
11:00:00: Balanced after 3 trials
|
|
11:00:00: Tank 2 is emptying at 27.70 ft
|
|
|
|
12:00:00: Balanced after 2 trials
|
|
12:00:00: Tank 2 is filling at 27.64 ft
|
|
|
|
13:00:00: Balanced after 3 trials
|
|
13:00:00: Tank 1 is filling at 21.73 ft
|
|
|
|
14:00:00: Balanced after 3 trials
|
|
|
|
15:00:00: Pump 10 changed by timer control
|
|
15:00:00: Balanced after 5 trials
|
|
15:00:00: Reservoir Lake is closed
|
|
15:00:00: Tank 1 is emptying at 21.98 ft
|
|
15:00:00: Tank 2 is emptying at 28.20 ft
|
|
15:00:00: Pump 10 changed from open to closed
|
|
|
|
16:00:00: Balanced after 3 trials
|
|
|
|
17:00:00: Balanced after 2 trials
|
|
|
|
18:00:00: Balanced after 3 trials
|
|
|
|
19:00:00: Balanced after 2 trials
|
|
|
|
20:00:00: Balanced after 3 trials
|
|
|
|
21:00:00: Balanced after 2 trials
|
|
|
|
21:19:39: Pump 335 changed by Tank 1 control
|
|
21:19:39: Pipe 330 changed by Tank 1 control
|
|
21:19:39: Balanced after 5 trials
|
|
21:19:39: Tank 1 is filling at 17.10 ft
|
|
21:19:39: Tank 3 is filling at 29.68 ft
|
|
21:19:39: Pipe 330 changed from open to closed
|
|
21:19:39: Pump 335 changed from closed to open
|
|
|
|
22:00:00: Balanced after 3 trials
|
|
22:00:00: Tank 1 is emptying at 17.30 ft
|
|
|
|
23:00:00: Balanced after 3 trials
|
|
|
|
24:00:00: Balanced after 4 trials
|
|
24:00:00: Tank 1 is filling at 15.79 ft
|
|
|
|
Analysis ended Tue Jan 22 11:23:18 2013
|