Page 1 Tue Jan 22 11:23:06 2013
******************************************************************
* E P A N E T *
* Hydraulic and Water Quality *
* Analysis for Pipe Networks *
* Version 2.00.12 *
******************************************************************
Analysis begun Tue Jan 22 11:23:06 2013
Hydraulic Status:
-----------------------------------------------------------------------
0:00:00: Balanced after 5 trials
0:00:00: Reservoir River is emptying
0:00:00: Reservoir Lake is closed
0:00:00: Tank 1 is filling at 13.10 ft
0:00:00: Tank 2 is emptying at 23.50 ft
0:00:00: Tank 3 is filling at 29.00 ft
1:00:00: Pump 10 changed by timer control
1:00:00: Balanced after 7 trials
1:00:00: Reservoir Lake is emptying
1:00:00: Pump 10 changed from closed to open
2:00:00: Balanced after 3 trials
2:00:00: Tank 2 is filling at 20.90 ft
3:00:00: Balanced after 2 trials
4:00:00: Balanced after 3 trials
4:13:33: Pump 335 changed by Tank 1 control
4:13:33: Pipe 330 changed by Tank 1 control
4:13:33: Balanced after 4 trials
4:13:33: Pipe 330 changed from closed to open
4:13:33: Pump 335 changed from open to closed
5:00:00: Balanced after 3 trials
5:00:00: Tank 3 is emptying at 34.30 ft
6:00:00: Balanced after 3 trials
6:00:00: Tank 3 is filling at 34.12 ft
7:00:00: Balanced after 3 trials
8:00:00: Balanced after 2 trials
9:00:00: Balanced after 3 trials
9:00:00: Tank 3 is emptying at 35.15 ft
10:00:00: Balanced after 2 trials
10:00:00: Tank 1 is emptying at 22.20 ft
11:00:00: Balanced after 3 trials
11:00:00: Tank 2 is emptying at 27.70 ft
12:00:00: Balanced after 2 trials
12:00:00: Tank 2 is filling at 27.64 ft
13:00:00: Balanced after 3 trials
13:00:00: Tank 1 is filling at 21.73 ft
14:00:00: Balanced after 3 trials
15:00:00: Pump 10 changed by timer control
15:00:00: Balanced after 5 trials
15:00:00: Reservoir Lake is closed
15:00:00: Tank 1 is emptying at 21.98 ft
15:00:00: Tank 2 is emptying at 28.20 ft
15:00:00: Pump 10 changed from open to closed
16:00:00: Balanced after 3 trials
17:00:00: Balanced after 2 trials
18:00:00: Balanced after 3 trials
19:00:00: Balanced after 2 trials
20:00:00: Balanced after 3 trials
21:00:00: Balanced after 2 trials
21:19:39: Pump 335 changed by Tank 1 control
21:19:39: Pipe 330 changed by Tank 1 control
21:19:39: Balanced after 5 trials
21:19:39: Tank 1 is filling at 17.10 ft
21:19:39: Tank 3 is filling at 29.68 ft
21:19:39: Pipe 330 changed from open to closed
21:19:39: Pump 335 changed from closed to open
22:00:00: Balanced after 3 trials
22:00:00: Tank 1 is emptying at 17.30 ft
23:00:00: Balanced after 3 trials
24:00:00: Balanced after 4 trials
24:00:00: Tank 1 is filling at 15.79 ft
Analysis ended Tue Jan 22 11:23:18 2013